Following resumption of lands on northern edge of Berry;s Bay by RMS for Westconnex Tunnel Works, these works will require that the existing at grade pedestrian track along the water’s edge may be required to be removed as a consequence of spoil needing to move across the waters edge for loading or off loading. MWA provided this Proposal to north Sydney COuncil to appraise the opportunity to implement a footbridge to the northern side of this RMS slandholding, allowing ‘roll through’ access to be maintained for pedestrians during RMS works, as well as providing an interesting and unique permanent additional to the Berry;s Bay pedestrian framework.