Working under a D&C arrangement with the Builder / Developer, this Project sought to identify a unique and identifiable design result, specific to the Tenant Business, that met all budget, logistical and environmental performance requirements. An integrated fitout maintained the design relationship between inside to outside.
![](http://mw-arch.com.au/wp-content/uploads/2021/10/street-view_close-977x1024.jpeg)
![](http://mw-arch.com.au/wp-content/uploads/2021/10/Street-View-with-Sign-1024x575.jpeg)
![](http://mw-arch.com.au/wp-content/uploads/2021/10/Internal-View-1024x576.jpeg)